Empowering Design Practices
  • HOME
  • About
    • TEAM
    • IMPACT
  • DISCOVERING
    • LEARNING FROM PAST PROJECTS
    • LEARNING FROM PROFESSIONALS
    • EXPLORING PUBLIC PERCEPTIONS
  • DEVELOPING
    • LONGITUDINAL PROJECTS
    • THEMED WORKSHOPS
    • TARGETED WORKSHOPS
    • DESIGN TRAINING
    • LIVE PROJECTS
    • STUDY TOURS
    • DESIGN STUDIO
    • EDUCATION & TRAINING
  • SHARING
    • GET INVOLVED
    • EDP AT EXTERNAL EVENTS
    • RELATED PROJECTS
    • EDP LIVE
  • EDP RESOURCES
    • ONLINE COURSE
    • INSPIRING DESIGN STORIES >
      • DESIGN PROJECT STORIES
      • STORIES OF COMMUNITY ENGAGEMENT IN DESIGN
    • HOW TO THINK ABOUT MAKING CHANGES >
      • DESIGN THINKING GUIDE
      • COMMUNITY-LED TRANSFORMATION: SOME KEY CONSIDERATIONS
    • EXPLORE DESIGN AND KEY DESIGN TASKS >
      • EXPLORE DESIGN: Community Buildings
      • DESIGN TRAINING: Film
      • DEVELOPING A SHARED PURPOSE: film
      • PREPARING TO WORK WITH ARCHITECTS
    • HOW TO ENGAGE COMMUNITIES IN DESIGN >
      • DESIGNING PLACES WITH PEOPLE: Booklets
      • COMMUNITY ENGAGEMENT IN DESIGN: Film
      • DIGITAL MEDIA booklet
      • USING DIGITAL MEDIA - film
  • Blog
  • CONTACT

Mossley Hill Church hosted study tour

15/3/2019

1 Comment

 
post by Vera Hale

On a rainy 16th of January 2019, EDP set up for a study tour that was hosted by the church of St Matthews and St James in Mossley Hill, Liverpool. The church is a grade II listed hilltop church on Rose Lane, that has undergone substantial refurbishment and renovation over the last few years, even winning an award for their re-ordering project. The hosted study tour at St Matthews and St James focused on the experience from the steering group during the engagement and the design process. Our main host for the day was David Bishop.
Picture
The main reason Mossley Hill Church wanted to reorder their place of worship was that they were looking at their long term future. Their key motivation was to stay open and increase their reach in the neighbourhood, but it was clear that they needed to start generating an income to pay for the maintenance of the building’s fabric. This led to their 2011 Vision Project, looking at the economic, environmental and social sustainable future of the building, with two areas of focus: the congregation and the wider community.

It took till 2016 (five years) before building works could start. During this period, as David described it, they did ‘1001 presentations’ for the congregation, faculty and the wider community, to help engage and involve all the possible stakeholders in the design and development process. This increased awareness, and generated funding and support along the way. It was hard to work with sub groups in the Vision Project as volunteers’ time was inconsistent, therefore the steering group of eight covered most of the workload. Consistency and communication within the steering group was key, as was David’s leadership.

They faced and dealt with various difficulties during this period. They needed to go through multiple iterations at pre-planning stage to satisfy planners and Historic England requirements. Removing the pews was the biggest problem. Lots of people were against this idea during the process, however at planning only five written objections were submitted. The pews were not original and only installed after the war, when the church suffered significant bombing damage and had to be rebuilt. The pews were eventually upcycled by a local carpenter and made into two or three seater benches that were sold to raise funds and now have a new life in the homes of many of the congregants. The rest of the timber from the pews was made into tables, a cross and other furniture for the church’s new interior.

As the church was not eligible for HLF funding they approached the development as a phased built to spread costs. They didn’t want to start until 100% of the funding was secured even though Faculty is granted when 90% of the finance is in place. Due to a legacy and the sale of the old rectory on a neighbouring plot they managed to get funding in place to do the main refurbishment; renewing the nursery space to Ofsted outstanding level, creating a new kitchen and cafe area and reconfiguring the ceremonial west entrance to house toilets, a pantry and AV hub. In future they want to glaze the West entrance doors and reconfigure the drive and outside of the church.
They shared a few tips regarding funding as it is one of the main issues for many of the participants on our study tours. Getting funding early, to conduct a feasibility study, is important to understand what requirements and goals for the project and further funding. But of course fundraising is a job in itself. Another important aspect is understanding when it the right time to approach HLF or other grant bodies and understanding the different conditions, timing and themes each scheme covers. Another tip from David and Brian was to try to get the best with the finance available, spending as much as possible to make things last and be fit for purpose. For example they chose high quality seating, tested and selected by the congregants during multiple engagement activities, so they would be easy to stack, hard wearing, comfortable and would not tip backwards.

The church was able to house existing users in their adjacent nursery during the build phase, which lead to a new dynamic that benefited the church. People saw what was happening to the building, and developed a feeling of kinship and alignment to the changes. Due to the temporary arrangement of space the church also had to change some of their worshipping rituals, which brought an increase in congregation. The traditional service, became a mixed service with the children being part of the worship instead of going to the ancillary space at the back of the nave. The change and the shortening of the family service has seen an increase in attending children and their families from 25 children to 90 on Sundays.

The church takes pride in the fact that during and after the build no one left the congregation - even those that had objected to Faculty stayed and realised what the Vision Project was trying to achieve. The whole building process benefited the church by opening up to the community. As David stated at the end of the tour, the key to the consultation process is taking people with you.

1 Comment

    EDP

    Blog from the EDP project team.

    Archives

    December 2021
    June 2021
    October 2020
    March 2020
    July 2019
    May 2019
    March 2019
    December 2018
    November 2018
    September 2018
    July 2018
    April 2018
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    March 2017
    December 2016
    November 2016
    October 2016
    August 2016
    February 2016
    January 2016
    October 2015
    July 2015
    March 2015

    Categories

    All
    Architecture
    Art
    Assets
    Bow Church
    Cemetery Road Baptist Church
    Chester
    Churches
    Civic Leadership
    Co-design
    Community
    Community Engagement
    Controversy
    Covid-19
    Design Challenges
    Design Training
    Diocese Of Ely
    EDP Live
    Educational Resources
    Emotions
    English Heritage
    Faith
    Film
    Focus Group
    Gaming
    Germany
    Heritage
    Heritage Lottery Fund
    Historic England
    History
    Innovative Design
    Intangible Legacies
    Israac Somali Cultural And Community Association
    Live Projects
    Major Parish Churches
    Opportunities
    Pews
    Policy
    Professionals
    Research
    Rural
    Schools
    Shared Spaces
    Sheffield Buddhist Centre
    Site Visit
    Site Visits
    Spirituality
    St John Stadhampton
    St. Luke's
    St. Martin's
    St Mary's Sheffield
    St Michael And All Angels
    Stratford Upon Avon URC
    Study Tour
    Style
    Sustainability
    Utopia
    Values
    Village Hall
    Vision
    Yorkshire Baptist Association

    RSS Feed

Proudly powered by Weebly